Why does concrete need steel bars?

≈ 5 min3 tasksNo course neededOpen
01
The idea

Concrete is strong squeezed, weak stretched

Pulled apart, concrete snaps at about a tenth of the force it takes squeezed. Steel bars do the pulling for it.

squeezestrong (≈ 30 MPa)pullweak (≈ 3 MPa)
02
Play with it

Load it, then add steel

The bottom of the beam is stretched. Load it with no steel, then add bars at the bottom.

P load in the middle5kN
M in the middle5.0kN·m
It can carry9.0kN
Concrete beam 200 × 300 mm, 4 m between supports, 0 Ø12 bars at the bottom, load 5.0 kN in the middle. Holds, no cracks.P = 5 kN→ top squeezed ←← bottom stretched →cut through itno steel

Concrete beam 200 × 300 mm, 4 m between supports. concrete: squeezed ≈ 30 MPa, stretched ≈ 3 MPa · steel: 500 MPa. Simplified: no safety factors, own weight left out.

Try this · 0/3Snap a beam with no steelCrack it, but keep it standingCarry 50 kN
03
The rule

Concrete takes the squeeze, steel takes the pull

Stretching stress at the bottom
σ=MW,W=bh26\sigma = \dfrac{\mom{M}}{W}, \quad W = \dfrac{b h^2}{6}
What the bars hold
M≈As fy⋅0.9 d\mom{M} \approx A_s\, f_y \cdot 0.9\,\len{d}

Cracks are normal in reinforced concrete. They tell you the steel is working. Plain concrete gives no warning: it cracks and snaps at once.

04
Your turn

Prove it

▲ Build1/3

The fewest bars for 50 kN

To do

Steel costs money. Use as few bars as you can, but the beam must hold.

P load in the middle50kN
M in the middle50.0kN·m
It can carry?kN
Concrete beam 200 × 300 mm, 4 m between supports, 0 Ø12 bars at the bottom, load 50.0 kN in the middle. Snaps as soon as it cracks.P = 50 kNIT SNAPScut through itno steel

Concrete beam 200 × 300 mm, 4 m between supports. concrete: squeezed ≈ 30 MPa, stretched ≈ 3 MPa · steel: 500 MPa. Simplified: no safety factors, own weight left out.

= Solve2/3

How hard is the bottom stretched?

To do

The beam above carries 6 kN\force{6}\,\mathrm{kN} in the middle of its 4 m\len{4}\,\mathrm{m} span. Its W=3×106 mm3W = 3 \times 10^6\,\mathrm{mm^3}. What is the stretching stress at the bottom?

The beam above carries 2 kip\force{2}\,\mathrm{kip} in the middle of its 12 ft\len{12}\,\mathrm{ft} span. Its W=192 in3W = 192\,\mathrm{in^3}. What is the stretching stress at the bottom?

MPa
◆ Pick3/3

A floor beam rests on two walls. Where do the main steel bars go?

To do
05 · Takeaway

Concrete squeezes. Steel pulls.

M≈As fy⋅0.9 d\mom{M} \approx A_s\, f_y \cdot 0.9\,\len{d}